It’s been awhile since I have written
something and Ann has been on my case to write something. We have
been working hard on getting the first house finished. There have
been many chances excel, that is to do things two and three time to
get them right. Since it has been a long time since I have done this
kind of work I have not always been able to remember or think of all
that needs to be done in time to incorporate them in( like not
putting a soap dish in the tile for the master bath shower).
We pressure checked the plumbing before
Elder Shaw left but when we turned the water on, there were two leaks
above the water heater in the copper tubing. I ended up having to cut
one of them clear out to fix it. This was a real challenge since they
were up in the over head against a heating ducting. Two days and a
trip to town for supplies latter they were fixed. I guess I should be
happy that they were at least exposed. The upstairs tub drain also
leaked so I had to cut a hole in the downstairs bathroom ceiling to
fix it.
We are fixing a crack in the ceiling
that occurred in the ceiling between the living room and the kitchen
where the old center bearing wall was. Ann has been working her butt
off fixing the paint job as best as it can be. She has been doing a
real good job, especially with what she has to work on.
The weather has been up and down. We
had a few nights where it was -17. Yesterday the high was 30 and
today it is supposed to get on the mid 60s. All in all it is warmer
here than in Mackay and if the wind didn’t blow all the time it
would be a very pleasant winter.
Till next time Ann gets after me.